A project consisting of grading, canals, concrete structures, site piping, pumps and a control building to increase the Kern County Water Agency's flexibility in delivering water to its customers in the Central Valley. 250, 350 and 600 HP motors were installed in a concrete pump station designed for efficient water flow. Large steel and RCP pipe was installed between flow control structures with hydraulic slide gates controlling the flow. Coffer dams were used to control existing flows and make connections between new and existing canals under tight deadlines. A control building was built to house the SCADA system used to...
Pump station, piping and other facilities to discharge water treatment by products into the Calleguas Salinity Management Pipeline. The work included mechanical piping, valves, concrete vaults & wet wells, meters, chemical feed equipment & piping and chemical tanks. The most challenging aspect of the work was the excavation, shoring and construction of a cast in place wet well below the existing ground water table in very limited space.