Sewer, Water, Storm Drain and Gas systems installed in tight coordination with other contractors on this fast track school project. Tough schedule constraints and small site made contract administration and control a necessity to meet project requirements.
Complete underground utility systems installed on difficult hill side locations. Installation in and amongst unknown existing utilities and constant plan changes made planning and flexibility a must for the completion of this project.
Installation of 4" to 14" chilled water and insulated hot water system to service buildings on the LMU campus. The project included valves, valve pits, paving, concrete and paving replacement and vehicle and foot traffic control. The entire installation had to be completed during the brief summer break for LMU students. Extensive preplanning, including submittals, traffic control, phasing and delivery of materials had to be done to ensure hitting the required milestones. Overtime and multiple crews were utilized to help meet the schedule. A tight job site had to be maintained in order to minimize the impact upon the campus...