24″ REW Pipeline from Mulholland Hwy to Tapia WRF
Installation of approximately 9,000 lf of 24″ welded steel pipe line in a narrow, heavily traveled main thoroughfare between Calabasas and the Pacific Coast Highway. Heavy traffic required restricted working hours and careful planning. The discovery of Native American artifacts required a switch from open cut construction to bore and jack for a portion of the job. One of the most challenging aspects of the job was the presence of an existing utility line running parallel to the new line, requiring careful and innovative shoring.
Project Details
Work With Us- Location: Calabasas, CA
- Owner: Las Virgenes Municipal Water District
- General Contractor: Blois Contruction, Inc.
- Contract Size: $3,502,391