CLWA 118B Groundwater Restoration Project
Installation of over 20,000 lf of welded steel pipe, varying for 10″ to 42″ in diameter in existing city streets, city bike paths and on 3 existing bridges crossing waterways. Construction easements on bike paths were very limited and had very tight and strict schedule milestone that had to be met to accommodate City events. Heavy traveled and high traffic streets required that 50% of the street work to be installed at night. Existing utilities required installation of the 42″ steel pipe at depths of 20 to 25 feet deep in the busy intersections. Environmental and biological monitoring was required for the installation across existing waterways.
Project Details
Work With Us- Location: Santa Clarita, CA
- Owner: Castaic Laker Water Agency
- General Contractor: Blois Contruction, Inc.
- Contract Size: $13,369,519