Palisades Garden Walk
A crowded, congested small site in the heart of the Santa Monica required intensive planning and multiple backup plans in order to meet the schedule. On and offsite sewer and storm drain were the heart of the project, with multiple connections to existing utilities. The offsite sewer included depths of over 30 feet deep in the main drag of Santa Monica, Ocean Ave. One of the more challenging items of work involved installing an offsite water line across and down Ocean Ave and right in front of the iconic Santa Monica Pier.
Project Details
Work With Us- Location: Santa Monica, CA
- Owner: City of Santa Monica
- General Contractor: W.E. O'Neil Construction Co.
- Contract Size: $1,694,776.00