Sony Main Street Improvements
Complete replacement of existing utilities in Sony Studios “Main Street” at their Culver City studios. Storm drain, sewer, domestic and fire water and steel gas line systems were installed in extremely tight conditions and scheduling restraints. The studios production schedule required Blois to work seven days a week and double shifts. In addition, work locations and access were constantly changed to meet the studio’s needs. Unknown or mis-marked existing utilities resulted in “on-the-fly” design changes and made for challenging work.
Project Details
Work With Us- Location: Culver City, CA
- Owner: Sony Studios
- General Contractor: Driver SPG
- Contract Size: $1,189,903